Catalogue / Power system studies (load flow, short circuit, grid code)
Grid code compliance study, Volt seriesSample
by Ravinandi Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravinandi Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Grid code compliance study from Ravinandi, Volt series: 3 network scale options between 132 kV system and 400 kV system. Highlights: reports for GNA/connectivity application, PSS/E and PSCAD model support and relay setting files ready to load. Typically used for utilities and consultants, industrial plants adding generation and renewable developers seeking connectivity. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation Kick-off in 1 week; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravinandi
- Model
- RAV-4C2 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Kick-off in 1 week
- Warranty
- Clarifications to utility at no cost
- Standards
- CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Network scale132 kV systemRAV-4C2-01 | Network scale: 132 kV system | 1 report · Kick-off in 1 week | on quote |
| Network scale220 kV systemRAV-4C2-02 | Network scale: 220 kV system | 1 report · Kick-off in 1 week | on quote |
| Network scale400 kV systemRAV-4C2-03 | Network scale: 400 kV system | 1 report · Kick-off in 1 week | on quote |
Specifications
| Network scale | 132 kV system to 400 kV system (see variants) |
|---|---|
| Study type | Load flow and short circuitmade to order: Dynamic and transient / Harmonics / Protection coordination |
| Software | ETAPmade to order: PSS/E / DIgSILENT PowerFactory |
| Model data | Client single line diagram and datamade to order: Utility network model |
| Deliverables | Model files and relay settingsmade to order: Study report with results |
| Grid code checks | Voltage and reactive power capabilitymade to order: LVRT/HVRT and ramp rate |
| Review | Lender review |
| Scenarios | Normal and N-1 |
| Team | Lead plus modelling specialist |
| Turnaround | 4-6 weeks |
| Validation | Peer review |