Catalogue / Resource assessment (solar, wind, hydro)

No photo yet

Wind resource assessment with met mast, Eco 9 seriesSample

by Ravinandi Consultants (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Ravinandi Consultants (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Ravinandi Eco 9 wind resource assessment with met mast, offered in 5 measurement duration options from Desktop study to 18 months. Design: turbine and module selection input, loss factors for local conditions and data quality control and filling. Typically used for wind and solar developers, hybrid project planners and lenders needing P90. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Ravinandi
Model
RAV-CB1 series
Listing type
Service
Unit
report
Minimum order
1 report
Lead time
Desktop in 2-3 weeks
Warranty
Data availability guarantee above 95%
Standards
IEC 61400-12-1, IEC 61724-1, IEC 61400-15
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Measurement durationDesktop studyRAV-CB1-01Measurement duration: Desktop study1 report · Desktop in 2-3 weeksfor verified buyers
Measurement duration3 monthsRAV-CB1-02Measurement duration: 3 months1 report · Desktop in 2-3 weeksfor verified buyers
Measurement duration6 monthsRAV-CB1-03Measurement duration: 6 months1 report · Desktop in 2-3 weeksfor verified buyers
Measurement duration12 monthsRAV-CB1-04Measurement duration: 12 months1 report · Campaign 3-24 monthsfor verified buyers
Measurement duration18 monthsRAV-CB1-05Measurement duration: 18 months1 report · Campaign 3-24 monthsfor verified buyers

Specifications

Measurement durationDesktop study to 18 months (see variants)
TechnologySmall hydromade to order: Solar GHI/DNI / Wind
Data sourceOn-site measurementmade to order: Satellite and reanalysis / Hybrid with MCP
EquipmentClass A pyranometer stationmade to order: 80-120 m met mast with LiDAR
UncertaintyBankable assessment
ModellingPVsyst, SAMmade to order: WAsP, WindPRO
DeliverableHourly time series dataset
CalibrationCalibration pre and post campaignmade to order: Traceable calibration
Site countSingle site
MaintenanceRemote health checks
TurnaroundReport in 3 weeksmade to order: Report within 6 weeks of data

BARREL: Bharat Atom Renewable Resources Energy Limited