Catalogue / Grid connectivity & GNA applications
LTA-to-GNA transition advisory, Plus seriesSample
by Ravinandi Consultants (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravinandi Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Plus service of LTA-to-GNA transition advisory by Ravinandi covers 6 capacity applied options (10 MW to 1000 MW). Highlights: regular updates of queue status, handling of CTU queries and support for relinquishment and transfer. Used by renewable developers, industrial captive generators and storage developers. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Grant 3-9 months; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravinandi
- Model
- RAV-0B6 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Grant 3-9 months
- Warranty
- As per contract
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied10 MWRAV-0B6-01 | Capacity applied: 10 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied50 MWRAV-0B6-02 | Capacity applied: 50 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied100 MWRAV-0B6-03 | Capacity applied: 100 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied250 MWRAV-0B6-04 | Capacity applied: 250 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied500 MWRAV-0B6-05 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied1000 MWRAV-0B6-06 | Capacity applied: 1000 MW | 1 application · Grant 3-9 months | for verified buyers |
Specifications
| Capacity applied | 10 MW to 1000 MW (see variants) |
|---|---|
| Application | Connectivity |
| Scope | End-to-end liaisonmade to order: Document preparation and filing |
| Bank guarantee | Arranged through partner bank |
| Studies | Grid impact summarymade to order: Detailed power system study |
| Portal handling | CTUIL portal |
| Team | Regulatory lead and engineermade to order: Dedicated manager |
| Timeline | Approval 3-6 monthsmade to order: Filing in 2 weeks |
| Technical documents | SLD, land proof, board resolutionmade to order: Switchyard layout and GA drawings |
| Queries | Responded within 2 days |
| Fee basis | Fixed plus success |