Catalogue / EPC / turnkey contracting
Turnkey solar PV EPC, Volt 9 seriesSample
by Ravi Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravi Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Ravi Volt 9 turnkey solar PV EPC, offered in 5 project capacity options from 5 MWp to 100 MWp. Design: single point responsibility under one contract, bankable yield estimate with guarantee and scheduled monthly progress reviews. Typically used for industrial captive power, IPPs and developers and group captive and open access. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, IEC 61215 and IEC 61730 and MNRE ALMM List-I. Mobilisation 3-6 months to commissioning; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravi
- Model
- RAV-AB1 series
- Listing type
- Service
- Unit
- MWp
- Minimum order
- 1 MWp
- Lead time
- 3-6 months to commissioning
- Warranty
- Inverter 5-10 years
- Standards
- CEA (Technical Standards for Connectivity) Regulations, IEC 61215 and IEC 61730, MNRE ALMM List-I
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Project capacity5 MWpRAV-AB1-01 | Project capacity: 5 MWp | 1 MWp · 3-6 months to commissioning | on quote |
| Project capacity10 MWpRAV-AB1-02 | Project capacity: 10 MWp | 1 MWp · 3-6 months to commissioning | on quote |
| Project capacity25 MWpRAV-AB1-03 | Project capacity: 25 MWp | 1 MWp · 3-6 months to commissioning | on quote |
| Project capacity50 MWpRAV-AB1-04 | Project capacity: 50 MWp | 1 MWp · Large projects 12 months | on quote |
| Project capacity100 MWpRAV-AB1-05 | Project capacity: 100 MWp | 1 MWp · Large projects 12 months | on quote |
Specifications
| Project capacity | 5 MWp to 100 MWp (see variants) |
|---|---|
| Scope | Design, supply, install, commission |
| Module technology | Non-DCR bifacialmade to order: Mono PERC DCR / TOPCon DCR |
| Inverter | String invertermade to order: Central inverter |
| Performance guarantee | PR 80% for first yearmade to order: PR 82% with CUF guarantee |
| Approvals | CEIG, DISCOM and net-metering |
| Contract basis | Lump sum fixed pricemade to order: Lump sum with price variation |
| Execution time | 6-9 monthsmade to order: 3-4 months / 12-14 months |
| O&M | 1 year free O&Mmade to order: 3-year O&M bundled / Optional O&M contract |
| Insurance | CAR and transit |
| Payment terms | Letter of credit basedmade to order: Milestones: 10/60/20/10 |