Catalogue / Civil & foundation works
Pile foundations for module mounting structures, Ultra seriesSample
by Ravi Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravi Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Pile foundations for module mounting structures from Ravi, Ultra series: 6 works volume options between 1 MW equivalent and 100 MW equivalent. Design: local labour employed where possible, cube and pile test records and monsoon-ready drainage planning. Suited to substations and control rooms, wind farms and industrial plants. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravi
- Model
- RAV-1C5 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Mobilisation in 10 days
- Warranty
- Pile load test certified
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume1 MW equivalentRAV-1C5-01 | Works volume: 1 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume5 MW equivalentRAV-1C5-02 | Works volume: 5 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume10 MW equivalentRAV-1C5-03 | Works volume: 10 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume25 MW equivalentRAV-1C5-04 | Works volume: 25 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume50 MW equivalentRAV-1C5-05 | Works volume: 50 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume100 MW equivalentRAV-1C5-06 | Works volume: 100 MW equivalent | 1 job · 4-12 weeks execution | on quote |
Specifications
| Works volume | 1 MW equivalent to 100 MW equivalent (see variants) |
|---|---|
| Foundation type | Raft or isolated footingmade to order: Driven steel pile / Ramming or screw pile / RCC bored pile |
| Concrete grade | M30 |
| Pull-out testing | Random test plus lateral load |
| Reinforcement | Fe 550Dmade to order: Fe 500D TMT |
| Roads and drainage | Not includedmade to order: Murram road, 4 m wide / WBM road with culverts |
| Boundary | Compound wall with barbed wiremade to order: Chain link fence 2.4 m |
| Quality | Cube test reports per pourmade to order: NABL lab testing of materials |
| Machinery | Piling rigs and excavatorsmade to order: Batching plant at site |
| Duration | 4-8 weeksmade to order: 3-6 months |
| Payment terms | Measured running billsmade to order: Item rate with retention |