Wind farm balance-of-plant maintenance, Max 9 seriesSample
by Ravi Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravi Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Wind farm balance-of-plant maintenance from Ravi, Max 9 series: 3 fleet size options between 20 turbines and 80 turbines. Key features: scheduled 6-monthly and annual services, oil analysis and trend reports and crane mobilisation planning. Used by aggregators of old fleets, wind farm owners post warranty and repowering and life extension. Delivered in line with IEC 61400-1, IEC 61400-25 and CEA (Measures relating to Safety) Regulations. Mobilisation Takeover in 4-6 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravi
- Model
- RAV-1B8 series
- Listing type
- Service
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- Takeover in 4-6 weeks
- Warranty
- Availability guarantee with LD
- Standards
- IEC 61400-1, IEC 61400-25, CEA (Measures relating to Safety) Regulations
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Fleet size20 turbinesRAV-1B8-01 | Fleet size: 20 turbines | 1 nos · Takeover in 4-6 weeks | on quote |
| Fleet size40 turbinesRAV-1B8-02 | Fleet size: 40 turbines | 1 nos · Takeover in 4-6 weeks | on quote |
| Fleet size80 turbinesRAV-1B8-03 | Fleet size: 80 turbines | 1 nos · Takeover in 4-6 weeks | on quote |
Specifications
| Fleet size | 20 turbines to 80 turbines (see variants) |
|---|---|
| Scope | Comprehensive including spares |
| Turbine class | 3 MW and abovemade to order: Up to 1.5 MW / 2-2.5 MW |
| Availability guarantee | 97% availability |
| Technician team | Local crew plus rope-access teammade to order: Site manager plus 2 technicians per 5 turbines |
| Blade inspection | Annual drone and rope inspection |
| Gearbox oil | Quarterly sampling and filtrationmade to order: Annual sampling |
| Major components | Excluded |
| Monitoring | Vibration based CMSmade to order: 24x7 remote SCADA |
| Response | 24 hours |
| Term | 1 year |