Moisture-proof and VCI packing, Pro 9 seriesSample
by Ravi Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravi Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Pro 9 service of moisture-proof and VCI packing by Ravi covers 4 packing volume options (5 CBM to 100 CBM). Design: customised crates for odd dimensions, packing list synchronised with dispatch and photo record before dispatch. Used by imported equipment repacking, equipment exporters and spare parts shipments. Delivered in line with ISPM 15, IS 15750 and IS 7028. Mobilisation Large lots 10 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravi
- Model
- RAV-235 series
- Listing type
- Service
- Unit
- lot
- Minimum order
- 1 lot
- Lead time
- Large lots 10 days
- Warranty
- Packing damage replacement
- Standards
- ISPM 15, IS 15750, IS 7028
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Packing volume5 CBMRAV-235-01 | Packing volume: 5 CBM | 1 lot · Large lots 10 days | on quote |
| Packing volume20 CBMRAV-235-02 | Packing volume: 20 CBM | 1 lot · Large lots 10 days | on quote |
| Packing volume50 CBMRAV-235-03 | Packing volume: 50 CBM | 1 lot · Large lots 10 days | on quote |
| Packing volume100 CBMRAV-235-04 | Packing volume: 100 CBM | 1 lot · Large lots 10 days | on quote |
Specifications
| Packing volume | 5 CBM to 100 CBM (see variants) |
|---|---|
| Material | Plywood cratesmade to order: ISPM-15 treated timber / Steel frames |
| Protection | Shock absorption foam |
| Marking | Handling symbols, tags |
| Packing list | Digital photo record |
| Heavy items | Skid mountingmade to order: Lashing for container |
| Location | At works |
| Fumigation | Included |
| Certification | Phytosanitary certificate |
| Turnaround | 10 days for large lots |
| Insurance | Cargo cover |