Protection relay testing and settings, Edge seriesSample

by Ravi Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Ravi Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Ravi Edge protection relay testing and settings, offered in 3 plant capacity options from 50 MW to 250 MW. Key features: commissioning certificates for lenders, handover training to O&M team and test formats agreed before mobilisation. Used by EPC handover to owners, DISCOM and STU charging and repowering projects. Delivered in line with IEC 62446-1, IEC 61724-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation 1-2 weeks on site; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Ravi
Model
RAV-A86 series
Listing type
Service
Unit
MW
Minimum order
1 MW
Lead time
1-2 weeks on site
Warranty
Retest at no cost if failure traced to test error
Standards
IEC 62446-1, IEC 61724-1, CEA (Technical Standards for Connectivity) Regulations
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity50 MWRAV-A86-01Plant capacity: 50 MW1 MW · 1-2 weeks on siteon quote
Plant capacity100 MWRAV-A86-02Plant capacity: 100 MW1 MW · 1-2 weeks on siteon quote
Plant capacity250 MWRAV-A86-03Plant capacity: 250 MW1 MW · 1-2 weeks on siteon quote

Specifications

Plant capacity50 MW to 250 MW (see variants)
Tests coveredString IV curve, insulation, earth
InstrumentsRelay test set, thermal cameramade to order: Calibrated IV tracer, megger, CRM
CalibrationNABL traceable certificates
TeamLead plus 5 member crew
Statutory supportCEIG inspection coordination
ReportsTest reports with signed formats
Duration on site3-4 weeks
Performance guarantee test72-hour trial run
Grid code checksReactive power and ramp rate
Payment50% on start, 50% on report