Catalogue / Feasibility studies & DPR

No photo yet

Techno-commercial feasibility study for solar projects, Volt 6 seriesSample

by Ravipushpak Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Ravipushpak Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Techno-commercial feasibility study for solar projects from Ravipushpak, Volt 6 series: 4 project capacity options between 10 MW and 500 MW. Design: statutory approvals roadmap, risk register with mitigations and lender-format financial model. Used by state agencies, industrial captive consumers and developers and IPPs. Delivered in line with MNRE Guidelines, CERC Tariff Regulations and IEC 61724-1. Mobilisation 3-12 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Ravipushpak
Model
RAV-231 series
Listing type
Service
Unit
report
Minimum order
1 report
Lead time
3-12 weeks
Warranty
Clarification support for 6 months
Standards
MNRE Guidelines, CERC Tariff Regulations, IEC 61724-1
Delivers to
South India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Project capacity10 MWRAV-231-01Project capacity: 10 MW1 report · 3-12 weekson quote
Project capacity50 MWRAV-231-02Project capacity: 50 MW1 report · 3-12 weekson quote
Project capacity100 MWRAV-231-03Project capacity: 100 MW1 report · 3-12 weekson quote
Project capacity500 MWRAV-231-04Project capacity: 500 MW1 report · 3-12 weekson quote

Specifications

Project capacity10 MW to 500 MW (see variants)
ScopePre-feasibility
Energy yieldWAsP wind energy assessmentmade to order: PVsyst P50/P90
Financial modelSensitivity and tariff analysis
Grid assessmentNearest substation capacity checkmade to order: GNA/connectivity route study
Site visitTwo visits with geotechmade to order: One visit with drone survey
Environmental screeningIncluded
TeamMulti-disciplinary team of 5made to order: Lead consultant and analyst
Turnaround3-4 weeksmade to order: 6-8 weeks / 10-12 weeks
DeliverablePDF report with Excel model
Review roundsTwo with client comments

BARREL: Bharat Atom Renewable Resources Energy Limited