Catalogue / Power system studies (load flow, short circuit, grid code)
Protection coordination and relay setting, Eco 3 seriesSample
by Ravipushpak Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravipushpak Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Eco 3 service of protection coordination and relay setting by Ravipushpak covers 6 network scale options (11 kV plant to 400 kV system). Key features: fault level verification of switchgear, relay setting files ready to load and reactive power capability curves. Suited to renewable developers seeking connectivity, utilities and consultants and industrial plants adding generation. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation 2-6 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravipushpak
- Model
- RAV-F17 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- 2-6 weeks
- Warranty
- Revision for utility comments
- Standards
- CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Network scale11 kV plantRAV-F17-01 | Network scale: 11 kV plant | 1 report · 2-6 weeks | on quote |
| Network scale33 kV plantRAV-F17-02 | Network scale: 33 kV plant | 1 report · 2-6 weeks | on quote |
| Network scale66 kV systemRAV-F17-03 | Network scale: 66 kV system | 1 report · 2-6 weeks | on quote |
| Network scale132 kV systemRAV-F17-04 | Network scale: 132 kV system | 1 report · 2-6 weeks | on quote |
| Network scale220 kV systemRAV-F17-05 | Network scale: 220 kV system | 1 report · 2-6 weeks | on quote |
| Network scale400 kV systemRAV-F17-06 | Network scale: 400 kV system | 1 report · 2-6 weeks | on quote |
Specifications
| Network scale | 11 kV plant to 400 kV system (see variants) |
|---|---|
| Study type | Harmonicsmade to order: Load flow and short circuit / Dynamic and transient / Protection coordination |
| Software | PSS/Emade to order: ETAP / DIgSILENT PowerFactory |
| Model data | Client single line diagram and datamade to order: Utility network model |
| Deliverables | Study report with results |
| Grid code checks | Voltage and reactive power capabilitymade to order: LVRT/HVRT and ramp rate |
| Review | Lender reviewmade to order: Utility submission support |
| Scenarios | Multiple dispatch cases |
| Team | Power system engineer |
| Turnaround | 4-6 weeksmade to order: 2-3 weeks |
| Validation | Peer reviewmade to order: Compared with measured data |