Catalogue / Resource assessment (solar, wind, hydro)

No photo yet

Solar resource assessment with ground measurement, Edge 4 seriesSample

by Ravipushpak Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Ravipushpak Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Solar resource assessment with ground measurement from Ravipushpak, Edge 4 series: 3 measurement duration options between 6 months and 18 months. Key features: independent bankable estimate, loss factors for local conditions and data quality control and filling. Typically used for lenders needing P90, hybrid project planners and state agencies mapping resource. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Ravipushpak
Model
RAV-0E4 series
Listing type
Service
Unit
report
Minimum order
1 report
Lead time
Desktop in 2-3 weeks
Warranty
As per contract
Standards
IEC 61400-12-1, IEC 61724-1, IEC 61400-15
Delivers to
South India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Measurement duration6 monthsRAV-0E4-01Measurement duration: 6 months1 report · Desktop in 2-3 weekson quote
Measurement duration12 monthsRAV-0E4-02Measurement duration: 12 months1 report · Desktop in 2-3 weekson quote
Measurement duration18 monthsRAV-0E4-03Measurement duration: 18 months1 report · Desktop in 2-3 weekson quote

Specifications

Measurement duration6 months to 18 months (see variants)
TechnologySmall hydromade to order: Solar GHI/DNI / Wind
Data sourceSatellite and reanalysismade to order: On-site measurement / Hybrid with MCP
EquipmentClass A pyranometer stationmade to order: 80-120 m met mast with LiDAR
UncertaintyBankable assessment
ModellingPVsyst, SAM
DeliverableHourly time series dataset
CalibrationCalibration pre and post campaignmade to order: Traceable calibration
Site countMulti-site comparison
MaintenanceQuarterly site visitmade to order: Remote health checks
TurnaroundReport in 3 weeksmade to order: Report within 6 weeks of data

BARREL: Bharat Atom Renewable Resources Energy Limited