The Prime service of GNA application with CTUIL by Ravipushpak covers 6 capacity applied options (10 MW to 1000 MW). Design: bank guarantee timeline tracking, regular updates of queue status and eligibility check before filing. Used by green hydrogen projects, storage developers and industrial captive generators. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Filing in 1-2 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravipushpak
- Model
- RAV-B84 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Filing in 1-2 weeks
- Warranty
- As per contract
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied10 MWRAV-B84-01 | Capacity applied: 10 MW | 1 application · Filing in 1-2 weeks | on quote |
| Capacity applied50 MWRAV-B84-02 | Capacity applied: 50 MW | 1 application · Filing in 1-2 weeks | on quote |
| Capacity applied100 MWRAV-B84-03 | Capacity applied: 100 MW | 1 application · Filing in 1-2 weeks | on quote |
| Capacity applied250 MWRAV-B84-04 | Capacity applied: 250 MW | 1 application · Filing in 1-2 weeks | on quote |
| Capacity applied500 MWRAV-B84-05 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied1000 MWRAV-B84-06 | Capacity applied: 1000 MW | 1 application · Grant 3-9 months | on quote |
Specifications
| Capacity applied | 10 MW to 1000 MW (see variants) |
|---|---|
| Application | Both |
| Scope | End-to-end liaisonmade to order: Document preparation and filing |
| Bank guarantee | Arranged by client |
| Studies | Detailed power system study |
| Portal handling | STU portal |
| Team | Regulatory lead and engineer |
| Timeline | Approval 3-6 monthsmade to order: Filing in 2 weeks |
| Technical documents | SLD, land proof, board resolutionmade to order: Switchyard layout and GA drawings |
| Queries | Until grant |
| Fee basis | Fixed plus success |