Catalogue / Grid connectivity & GNA applications
Stage-II connectivity and bank guarantee support, Core seriesSample
by Ravipushpak Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravipushpak Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Core service of stage-II connectivity and bank guarantee support by Ravipushpak covers 3 capacity applied options (100 MW to 500 MW). Key features: bank guarantee timeline tracking, regular updates of queue status and support for relinquishment and transfer. Used by industrial captive generators, storage developers and renewable developers. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Filing in 1-2 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravipushpak
- Model
- RAV-379 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Filing in 1-2 weeks
- Warranty
- Rework of deficient applications
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied100 MWRAV-379-01 | Capacity applied: 100 MW | 1 application · Filing in 1-2 weeks | on quote |
| Capacity applied250 MWRAV-379-02 | Capacity applied: 250 MW | 1 application · Filing in 1-2 weeks | on quote |
| Capacity applied500 MWRAV-379-03 | Capacity applied: 500 MW | 1 application · Filing in 1-2 weeks | on quote |
Specifications
| Capacity applied | 100 MW to 500 MW (see variants) |
|---|---|
| Application | GNA |
| Scope | End-to-end liaison |
| Bank guarantee | Arranged by client |
| Studies | Detailed power system study |
| Portal handling | CTUIL portalmade to order: STU portal |
| Team | Dedicated managermade to order: Regulatory lead and engineer |
| Timeline | Approval 3-6 monthsmade to order: Filing in 2 weeks |
| Technical documents | Switchyard layout and GA drawingsmade to order: SLD, land proof, board resolution |
| Queries | Until grantmade to order: Responded within 2 days |
| Fee basis | Fixed |