Catalogue / Steam turbines & condensers

No photo yet

Surface condenser, Prime 9 seriesSample

by Ravi Thermal Systems (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Ravi Thermal Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Prime 9 range of surface condenser by Ravi covers 6 output options (1 MW to 120 MW). Key features: efficient blade profiles with high efficiency, electro-hydraulic governing system and turning gear and lube oil system included. Typically used for waste heat to power, sugar cogeneration and captive power plants. Designed and tested to IEC 60045, IS 4351 and HEI standards. Lead time 8-12 months; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Ravi
Model
RAV-B66 series
Listing type
Product
Unit
nos
Minimum order
5 nos
Lead time
8-12 months
Warranty
18 months
Standards
IEC 60045, IS 4351, HEI standards
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Packaging
Corrugated box on pallet
Delivery terms
FOR site, freight included
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Output1 MWRAV-B66-01Output: 1 MW5 nos · 8-12 monthsfor verified buyers
Output5 MWRAV-B66-02Output: 5 MW5 nos · 8-12 monthsfor verified buyers
Output12 MWRAV-B66-03Output: 12 MW5 nos · 8-12 monthsfor verified buyers
Output30 MWRAV-B66-04Output: 30 MW5 nos · 8-12 monthsfor verified buyers
Output60 MWRAV-B66-05Output: 60 MW5 nos · 14-20 monthsfor verified buyers
Output120 MWRAV-B66-06Output: 120 MW5 nos · 14-20 monthsfor verified buyers

Specifications

Output1 MW to 120 MW (see variants)
Turbine typeExtraction
Inlet steam67 ata / 485 Cmade to order: 45 ata / 440 C / 130 ata / 535 C
Speed3000 rpmmade to order: 5500 rpm with gearbox
Exhaust pressure0.1 atamade to order: 3.5 ata / 8 ata
Condenser typeAir cooled
Tube materialSS 304made to order: Admiralty brass
GoverningElectro-hydraulic
Generator couplingGearbox
ExtractionSingle
Lube oil systemAC and DC driven pumps

BARREL: Bharat Atom Renewable Resources Energy Limited