Catalogue / Steam turbines & condensers
Surface condenser, Ultra seriesSample
by Ravi Thermal Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravi Thermal Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Surface condenser from Ravi, Ultra series: 5 output options between 1 MW and 60 MW. Key features: fully assembled skid for small units, extraction for process steam and vibration and temperature monitoring. Typically used for sugar cogeneration, waste heat to power and captive power plants. Designed and tested to IEC 60045, IS 4351 and HEI standards. Lead time 14-20 months; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravi
- Model
- RAV-B69 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 5 nos
- Lead time
- 14-20 months
- Warranty
- 18 months
- Standards
- IEC 60045, IS 4351, HEI standards
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- FOR site, freight included
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Output1 MWRAV-B69-01 | Output: 1 MW | 5 nos · 14-20 months | for verified buyers |
| Output5 MWRAV-B69-02 | Output: 5 MW | 5 nos · 14-20 months | for verified buyers |
| Output12 MWRAV-B69-03 | Output: 12 MW | 5 nos · 14-20 months | for verified buyers |
| Output30 MWRAV-B69-04 | Output: 30 MW | 5 nos · 14-20 months | for verified buyers |
| Output60 MWRAV-B69-05 | Output: 60 MW | 5 nos · 14-20 months | for verified buyers |
Specifications
| Output | 1 MW to 60 MW (see variants) |
|---|---|
| Turbine type | Condensingmade to order: Back-pressure / Extraction |
| Inlet steam | 67 ata / 485 C |
| Speed | 5500 rpm with gearbox |
| Exhaust pressure | 8 atamade to order: 0.1 ata / 3.5 ata |
| Condenser type | Shell and tubemade to order: Air cooled |
| Tube material | SS 304 |
| Governing | Electro-hydraulic |
| Generator coupling | Directmade to order: Gearbox |
| Extraction | Double |
| Lube oil system | AC and DC driven pumps |