Catalogue / Installation & erection
Power transformer installation and oil filling, Plus seriesSample
by Sabarmati Engineering Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Sabarmati Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Plus service of power transformer installation and oil filling by Sabarmati covers 6 installation scope options (1 MW to 100 MW). Highlights: material reconciliation reports, cable route marking and tray fixing and torque-verified structure and module fixing. Used by wind farm substations, c&I rooftop and ground mount and hybrid projects. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Phased by block; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Sabarmati
- Model
- SAB-712 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Phased by block
- Warranty
- Workmanship 12 months
- Standards
- IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installation scope1 MWSAB-712-01 | Installation scope: 1 MW | 1 MW · Phased by block | for verified buyers |
| Installation scope5 MWSAB-712-02 | Installation scope: 5 MW | 1 MW · Phased by block | for verified buyers |
| Installation scope10 MWSAB-712-03 | Installation scope: 10 MW | 1 MW · Phased by block | for verified buyers |
| Installation scope25 MWSAB-712-04 | Installation scope: 25 MW | 1 MW · Phased by block | for verified buyers |
| Installation scope50 MWSAB-712-05 | Installation scope: 50 MW | 1 MW · Phased by block | for verified buyers |
| Installation scope100 MWSAB-712-06 | Installation scope: 100 MW | 1 MW · Phased by block | for verified buyers |
Specifications
| Installation scope | 1 MW to 100 MW (see variants) |
|---|---|
| Scope | Electrical BoP erection |
| Manpower deployed | 60 technicians plus supervisors |
| Supervision | Site engineer and safety officer |
| Equipment | Pile driver, crane, telehandler |
| Quality plan | ISO 9001 QAP with hold pointsmade to order: Client-approved ITP |
| Safety | Lost-time-injury-free target, HIRA |
| Licence | Class A contractor registration |
| Insurance | CAR and workmen compensationmade to order: CAR, WC and third-party liability |
| Reporting | Weekly report with look-ahead plan |
| Payment terms | Monthly running billsmade to order: Milestone based with 10% retention |