Catalogue / Cabling, trenching & HDD works
Horizontal directional drilling for road and rail crossings, Elite 9 seriesSample
by Sabarmati Engineering Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Sabarmati Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Elite 9 service of horizontal directional drilling for road and rail crossings by Sabarmati covers 5 cable route length options (1 km to 20 km). Highlights: warning tape and marker installation, utility locating before excavation and HDD bore log and as-built survey. Suited to renewable plant internal networks, industrial plant cabling and urban distribution upgrades. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Permits may extend timeline; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Sabarmati
- Model
- SAB-C87 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Permits may extend timeline
- Warranty
- Workmanship 12 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length1 kmSAB-C87-01 | Cable route length: 1 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length2 kmSAB-C87-02 | Cable route length: 2 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length5 kmSAB-C87-03 | Cable route length: 5 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length10 kmSAB-C87-04 | Cable route length: 10 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length20 kmSAB-C87-05 | Cable route length: 20 km | 1 km · Permits may extend timeline | for verified buyers |
Specifications
| Cable route length | 1 km to 20 km (see variants) |
|---|---|
| Method | Trench plus HDD for crossings |
| HDD capacity | Up to 450 mm bore |
| Trench depth | 1.5 mmade to order: 0.9 m / 1.2 m |
| Cable type | LT armouredmade to order: 11/33 kV XLPE |
| Jointing | Heat shrinkmade to order: Cold shrink / Premoulded |
| Restoration | Road and footpath restoration |
| Permissions | Contractor arranges road cut approvals |
| Testing | Hipot and sheath testmade to order: Insulation and VLF test |
| Productivity | 300 m per day open trenchmade to order: 50 m per day HDD |
| Crew | Trenching team of 15made to order: HDD crew of 8 with rig |