Catalogue / Civil & foundation works

No photo yet

Control room and substation building construction, Duo seriesSample

by Sabarmati Engineering Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Sabarmati Engineering Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Duo service of control room and substation building construction by Sabarmati covers 4 works volume options (5 MW equivalent to 50 MW equivalent). Key features: daily quantity and progress log, local labour employed where possible and pile layout tolerance maintained to design. Suited to industrial plants, substations and control rooms and wind farms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Sabarmati
Model
SAB-3B3 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
Mobilisation in 10 days
Warranty
Structural defect liability 24 months
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume5 MW equivalentSAB-3B3-01Works volume: 5 MW equivalent1 job · Mobilisation in 10 dayson quote
Works volume10 MW equivalentSAB-3B3-02Works volume: 10 MW equivalent1 job · Mobilisation in 10 dayson quote
Works volume25 MW equivalentSAB-3B3-03Works volume: 25 MW equivalent1 job · 4-12 weeks executionon quote
Works volume50 MW equivalentSAB-3B3-04Works volume: 50 MW equivalent1 job · 4-12 weeks executionon quote

Specifications

Works volume5 MW equivalent to 50 MW equivalent (see variants)
Foundation typeRCC bored pilemade to order: Driven steel pile / Ramming or screw pile / Raft or isolated footing
Concrete gradeM30
Pull-out testing2% piles testedmade to order: Random test plus lateral load
ReinforcementFe 550D
Roads and drainageNot included
BoundaryChain link fence 2.4 m
QualityCube test reports per pour
MachineryBatching plant at sitemade to order: Piling rigs and excavators
Duration4-8 weeksmade to order: 3-6 months
Payment termsItem rate with retention

BARREL: Bharat Atom Renewable Resources Energy Limited