Catalogue / Civil & foundation works
Control room and substation building construction, Duo seriesSample
by Sabarmati Engineering Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Sabarmati Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Duo service of control room and substation building construction by Sabarmati covers 4 works volume options (5 MW equivalent to 50 MW equivalent). Key features: daily quantity and progress log, local labour employed where possible and pile layout tolerance maintained to design. Suited to industrial plants, substations and control rooms and wind farms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Sabarmati
- Model
- SAB-3B3 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Mobilisation in 10 days
- Warranty
- Structural defect liability 24 months
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume5 MW equivalentSAB-3B3-01 | Works volume: 5 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume10 MW equivalentSAB-3B3-02 | Works volume: 10 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume25 MW equivalentSAB-3B3-03 | Works volume: 25 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume50 MW equivalentSAB-3B3-04 | Works volume: 50 MW equivalent | 1 job · 4-12 weeks execution | on quote |
Specifications
| Works volume | 5 MW equivalent to 50 MW equivalent (see variants) |
|---|---|
| Foundation type | RCC bored pilemade to order: Driven steel pile / Ramming or screw pile / Raft or isolated footing |
| Concrete grade | M30 |
| Pull-out testing | 2% piles testedmade to order: Random test plus lateral load |
| Reinforcement | Fe 550D |
| Roads and drainage | Not included |
| Boundary | Chain link fence 2.4 m |
| Quality | Cube test reports per pour |
| Machinery | Batching plant at sitemade to order: Piling rigs and excavators |
| Duration | 4-8 weeksmade to order: 3-6 months |
| Payment terms | Item rate with retention |