Catalogue / Testing & commissioning
Solar plant commissioning and performance ratio test, Titan 6 seriesSample
by Sabarmati Engineering Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Sabarmati Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Solar plant commissioning and performance ratio test from Sabarmati, Titan 6 series: 6 plant capacity options between 1 MW and 100 MW. Key features: commissioning certificates for lenders, live relay setting verification and punch list tracked to closure. Typically used for EPC handover to owners, DISCOM and STU charging and lender completion tests. Delivered in line with IEC 62446-1, IEC 61724-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation Mobilisation in 5 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Sabarmati
- Model
- SAB-9A4 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Mobilisation in 5 days
- Warranty
- Retest at no cost if failure traced to test error
- Standards
- IEC 62446-1, IEC 61724-1, CEA (Technical Standards for Connectivity) Regulations
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity1 MWSAB-9A4-01 | Plant capacity: 1 MW | 1 MW · Mobilisation in 5 days | on quote |
| Plant capacity5 MWSAB-9A4-02 | Plant capacity: 5 MW | 1 MW · Mobilisation in 5 days | on quote |
| Plant capacity10 MWSAB-9A4-03 | Plant capacity: 10 MW | 1 MW · Mobilisation in 5 days | on quote |
| Plant capacity25 MWSAB-9A4-04 | Plant capacity: 25 MW | 1 MW · Mobilisation in 5 days | on quote |
| Plant capacity50 MWSAB-9A4-05 | Plant capacity: 50 MW | 1 MW · Report in 7 days | on quote |
| Plant capacity100 MWSAB-9A4-06 | Plant capacity: 100 MW | 1 MW · Report in 7 days | on quote |
Specifications
| Plant capacity | 1 MW to 100 MW (see variants) |
|---|---|
| Tests covered | String IV curve, insulation, earthmade to order: Transformer, switchgear, relay tests / Full plant functional and PR test |
| Instruments | Relay test set, thermal camera |
| Calibration | NABL traceable certificates |
| Team | Commissioning engineer plus 2 testersmade to order: Lead plus 5 member crew |
| Statutory support | CEIG inspection coordinationmade to order: DISCOM charging support |
| Reports | Test reports with signed formats |
| Duration on site | 3-4 weeksmade to order: 5-7 days / 10-14 days |
| Performance guarantee test | 72-hour trial run |
| Grid code checks | Not includedmade to order: Reactive power and ramp rate |
| Payment | Milestone on energisationmade to order: 50% on start, 50% on report |