CFBC boiler, Volt seriesSample
by Sahyadri Boilers (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Sahyadri Boilers (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Sahyadri Volt CFBC boiler, offered in 4 steam capacity options from 35 TPH to 300 TPH. Design: soot blowers with sequence control, meets CPCB norms with ESP or FGD and superheater and reheater tube metallurgy per design. Typically used for captive power plants, utility thermal power stations and cogeneration. Designed and tested to IBR 1950, IS 2825 and ASME Sec I. Lead time 10-14 months; delivers to South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Sahyadri
- Model
- SAH-192 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 10-14 months
- Warranty
- 12 months
- Standards
- IBR 1950, IS 2825, ASME Sec I
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Drum / reel with end caps
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Steam capacity35 TPHSAH-192-01 | Steam capacity: 35 TPH | 1 nos · 10-14 months | on quote |
| Steam capacity75 TPHSAH-192-02 | Steam capacity: 75 TPH | 1 nos · 10-14 months | on quote |
| Steam capacity150 TPHSAH-192-03 | Steam capacity: 150 TPH | 1 nos · 18-26 months | on quote |
| Steam capacity300 TPHSAH-192-04 | Steam capacity: 300 TPH | 1 nos · 18-26 months | on quote |
Specifications
| Steam capacity | 35 TPH to 300 TPH (see variants) |
|---|---|
| Boiler type | CFBCmade to order: PC / HRSG / Water-tube |
| Steam pressure | 45 barmade to order: 67 bar / 110 bar / 170 bar |
| Steam temperature | 540 C |
| Fuel | Lignitemade to order: Coal / Biomass / Gas |
| Circulation | Assisted |
| Design code | IBR |
| Efficiency | 89%made to order: 84% / 87% |
| Air preheater | Regenerativemade to order: Tubular |
| Emission control | Bag filter |
| Control | DCS |