Catalogue / Substation automation (IEC 61850)

No photo yet

Digital substation process bus, Titan seriesSample

by Sahyadri Protection Systems (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Sahyadri Protection Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Titan range of digital substation process bus by Sahyadri covers 5 bays options (Up to 8 bays to Up to 128 bays). Design: sequence of events recorder, single-line diagram with live status and redundant network with zero-recovery time. Typically used for transmission substations, metro traction and discom 33/11 kV substations. Designed and tested to IEC 61850, IEC 62351 and IEC 60870-5-104. Lead time 10-14 weeks; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Sahyadri
Model
SAH-981 series
Listing type
Product
Unit
lot
Minimum order
1 lot
Lead time
10-14 weeks
Warranty
36 months
Standards
IEC 61850, IEC 62351, IEC 60870-5-104
Delivers to
North India
GST rate
18 %
Country of origin
India
Packaging
As per item, transit-safe
Delivery terms
FOR nearest railhead
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
BaysUp to 8 baysSAH-981-01Bays: Up to 8 bays1 lot · 10-14 weeksfor verified buyers
BaysUp to 16 baysSAH-981-02Bays: Up to 16 bays1 lot · 10-14 weeksfor verified buyers
BaysUp to 32 baysSAH-981-03Bays: Up to 32 bays1 lot · 10-14 weeksfor verified buyers
BaysUp to 64 baysSAH-981-04Bays: Up to 64 bays1 lot · 16-24 weeksfor verified buyers
BaysUp to 128 baysSAH-981-05Bays: Up to 128 bays1 lot · 16-24 weeksfor verified buyers

Specifications

BaysUp to 8 bays to Up to 128 bays (see variants)
ArchitectureStation + process busmade to order: Station bus
ProtocolIEC 61850 Ed 2made to order: IEC 60870-5-104 / DNP3
Network topologyHSR ring
HMIRedundant serversmade to order: Single HMI
Time syncSNTPmade to order: GPS with PTP
GatewayRedundant to RLDC / SLDC
Cyber-securityFirewall, IEC 62351, NERC style
HistorianIncluded, 5 years data
Engineering toolConfiguration software
Network switchesIndustrial managed
Auxiliary supply110 V DC
TestingFAT + SAT

BARREL: Bharat Atom Renewable Resources Energy Limited