Catalogue / Static transfer switches

No photo yet

Three-phase STS cabinet, Core 6 seriesSample

by Satavahana Critical Power (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Satavahana Critical Power (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Satavahana Core 6 three-phase STS cabinet, offered in 4 rating options from 32 A to 250 A. Key features: thyristor-based switching under 6 ms, hot-swap design on rack models and phase-angle synchronism check before transfer. Typically used for hospital critical loads, dual UPS bus architecture and single-corded server loads in data centres. Designed and tested to IEC 62310-3, IEC 62310-1 and IEC 62310-2. Lead time 3-4 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Satavahana
Model
SAT-B45 series
Listing type
Product
Unit
nos
Minimum order
1 nos
Lead time
3-4 weeks
Warranty
24 months from supply
Standards
IEC 62310-3, IEC 62310-1, IEC 62310-2
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
Corrugated box on pallet
Delivery terms
Ex-works, freight extra at actuals
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Rating32 ASAT-B45-01Rating: 32 A1 nos · 3-4 weeksfor verified buyers
Rating63 ASAT-B45-02Rating: 63 A1 nos · 3-4 weeksfor verified buyers
Rating125 ASAT-B45-03Rating: 125 A1 nos · 6-8 weeksfor verified buyers
Rating250 ASAT-B45-04Rating: 250 A1 nos · 6-8 weeksfor verified buyers

Specifications

Rating32 A to 250 A (see variants)
Phase3-phase 4-wiremade to order: 1-phase
Rated voltage230 V AC
Transfer timeBelow 6 ms
Transfer typeMake-before-break
Switching deviceSCR thyristors
Source priorityPreferred source selectable
Maintenance bypassManual make-before-break
Overload150% 1 minmade to order: 125% 10 min
EfficiencyAbove 99%
DisplayLCDmade to order: Touchscreen
CommunicationSNMPmade to order: Modbus RTU / Dry contacts
Mounting1U/2U rack

BARREL: Bharat Atom Renewable Resources Energy Limited