Catalogue / Static & modular UPS
Industrial UPS with isolation transformer, Plus 8 seriesSample
by Satavahana Critical Power (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Satavahana Critical Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Plus 8 range of industrial UPS with isolation transformer by Satavahana covers 6 rating options (10 kVA to 250 kVA). Design: wide input window reduces battery use, parallel redundant architecture and battery health monitoring and temperature compensation. Used by data centres, hospitals and OT and industrial control rooms. Designed and tested to IEC 62040-1, IEC 62040-3 and IS 16242 (Part 1). Lead time 3-4 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Satavahana
- Model
- SAT-CB4 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 3-4 weeks
- Warranty
- 24 months from supply
- Standards
- IEC 62040-1, IEC 62040-3, IS 16242 (Part 1)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Wooden crate, seaworthy
- Delivery terms
- FOR site, freight included
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Rating10 kVASAT-CB4-01 | Rating: 10 kVA | 1 nos · 3-4 weeks | for verified buyers |
| Rating20 kVASAT-CB4-02 | Rating: 20 kVA | 1 nos · 3-4 weeks | for verified buyers |
| Rating40 kVASAT-CB4-03 | Rating: 40 kVA | 1 nos · 3-4 weeks | for verified buyers |
| Rating80 kVASAT-CB4-04 | Rating: 80 kVA | 1 nos · 3-4 weeks | for verified buyers |
| Rating160 kVASAT-CB4-05 | Rating: 160 kVA | 1 nos · 8-10 weeks | for verified buyers |
| Rating250 kVASAT-CB4-06 | Rating: 250 kVA | 1 nos · 8-10 weeks | for verified buyers |
Specifications
| Rating | 10 kVA to 250 kVA (see variants) |
|---|---|
| Topology | Eco mode capable |
| Input / output | 3-phase in / 3-phase outmade to order: 3-phase in / 1-phase out / 1-phase in / 1-phase out |
| Power factor | 1.0 |
| Efficiency | Up to 96.5%made to order: Up to 95% / Up to 97% |
| Input THDi | Below 5% |
| Battery | External string |
| Bypass | Internal static onlymade to order: Static + manual maintenance |
| Overload capacity | 125% 10 min |
| Redundancy | N |
| Communication | Modbus TCPmade to order: SNMP / Relay contacts |
| Parallel capability | Up to 8 units |
| Degree of protection | IP21made to order: IP20 |