Catalogue / Hot-gas-path parts & overhaul kits
Fuel nozzle set, Neo 4 seriesSample
by Satavahana Engine Power (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Satavahana Engine Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Fuel nozzle set from Satavahana, Neo 4 series: 4 turbine class options between 30 MW and 150 MW. Highlights: thermal barrier coating applied, dimensional inspection to OEM drawings and kits packed per inspection type. Used by gas turbine overhauls, industrial gas turbine owners and third-party service providers. Designed and tested to ISO 3977, ASTM B637 and AMS 5383. Lead time 8-16 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Satavahana
- Model
- SAT-016 series
- Listing type
- Product
- Unit
- set
- Minimum order
- 1 set
- Lead time
- 8-16 weeks
- Warranty
- 8000 equivalent operating hours
- Standards
- ISO 3977, ASTM B637, AMS 5383
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Packaging
- Drum / reel with end caps
- Delivery terms
- FOR nearest railhead
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Turbine class30 MWSAT-016-01 | Turbine class: 30 MW | 1 set · 8-16 weeks | on quote |
| Turbine class50 MWSAT-016-02 | Turbine class: 50 MW | 1 set · 8-16 weeks | on quote |
| Turbine class100 MWSAT-016-03 | Turbine class: 100 MW | 1 set · 20-36 weeks | on quote |
| Turbine class150 MWSAT-016-04 | Turbine class: 150 MW | 1 set · 20-36 weeks | on quote |
Specifications
| Turbine class | 30 MW to 150 MW (see variants) |
|---|---|
| Component | Combustormade to order: Blades / Vanes / Nozzles |
| Stage | All stagesmade to order: Stage 1 / Stage 2 |
| Base alloy | Cobalt alloymade to order: Nickel superalloy |
| Coating | MCrAlY |
| Cooling | Impingementmade to order: Film cooled |
| Origin | Third-party certifiedmade to order: OEM |
| Refurbishment | New |
| Inspection | Fluorescent penetrant, X-ray |
| Service interval | 24000 hrsmade to order: 32000 hrs |
| Documentation | Material and heat certificates |