Catalogue / Solar & wind BoP construction
Control room and SCADA works, Edge seriesSample
by Satavahanakelvin Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Satavahanakelvin Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Satavahanakelvin Edge control room and SCADA works, offered in 6 project size options from 10 MW to 400 MW. Highlights: cable tray and glanding workmanship, compliance with site safety plan and cable route survey and marking. Suited to IPPs managing multiple packages, wind-solar hybrid parks and EPC contractors subcontracting BoP. Delivered in line with IS 7098 (XLPE Cables), IEC 62548 and IS 3043 (Earthing). Mobilisation Mobilisation in 14 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Satavahanakelvin
- Model
- SAT-9E3 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Mobilisation in 14 days
- Warranty
- Defect liability 24 months
- Standards
- IS 7098 (XLPE Cables), IEC 62548, IS 3043 (Earthing)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Project size10 MWSAT-9E3-01 | Project size: 10 MW | 1 MW · Mobilisation in 14 days | on quote |
| Project size25 MWSAT-9E3-02 | Project size: 25 MW | 1 MW · Mobilisation in 14 days | on quote |
| Project size50 MWSAT-9E3-03 | Project size: 50 MW | 1 MW · Mobilisation in 14 days | on quote |
| Project size100 MWSAT-9E3-04 | Project size: 100 MW | 1 MW · Mobilisation in 14 days | on quote |
| Project size200 MWSAT-9E3-05 | Project size: 200 MW | 1 MW · 3-9 months execution | on quote |
| Project size400 MWSAT-9E3-06 | Project size: 400 MW | 1 MW · 3-9 months execution | on quote |
Specifications
| Project size | 10 MW to 400 MW (see variants) |
|---|---|
| Scope | Civil plus electrical BoP |
| DC cables | 6 sq mm solar cablemade to order: 4 sq mm solar cable |
| MV cables | 33 kV XLPE Cumade to order: 33 kV XLPE Al armoured |
| Inverter station | Brick built roommade to order: Skid or containerised |
| Lightning protection | ESE system |
| Crew size | 80 personsmade to order: 150 persons / 300 persons |
| Equipment | Own fleetmade to order: Trenchers, cranes, excavators |
| Quality | QAP with stage inspection |
| Duration | 3-5 months |
| Payment | Milestone basedmade to order: Monthly measured bills |