Catalogue / Civil & foundation works
Site roads, drainage and boundary wall, Neo seriesSample
by Satavahanakelvin Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Satavahanakelvin Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Neo service of site roads, drainage and boundary wall by Satavahanakelvin covers 6 works volume options (1 MW equivalent to 100 MW equivalent). Highlights: waterproofing for cable trenches, monsoon-ready drainage planning and daily quantity and progress log. Suited to industrial plants, substations and control rooms and wind farms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation 4-12 weeks execution; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Satavahanakelvin
- Model
- SAT-5E2 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 4-12 weeks execution
- Warranty
- Structural defect liability 24 months
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume1 MW equivalentSAT-5E2-01 | Works volume: 1 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume5 MW equivalentSAT-5E2-02 | Works volume: 5 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume10 MW equivalentSAT-5E2-03 | Works volume: 10 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume25 MW equivalentSAT-5E2-04 | Works volume: 25 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume50 MW equivalentSAT-5E2-05 | Works volume: 50 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume100 MW equivalentSAT-5E2-06 | Works volume: 100 MW equivalent | 1 job · 4-12 weeks execution | on quote |
Specifications
| Works volume | 1 MW equivalent to 100 MW equivalent (see variants) |
|---|---|
| Foundation type | Driven steel pilemade to order: Ramming or screw pile / RCC bored pile / Raft or isolated footing |
| Concrete grade | M40 for turbine foundation |
| Pull-out testing | Random test plus lateral load |
| Reinforcement | Fe 500D TMT |
| Roads and drainage | WBM road with culvertsmade to order: Murram road, 4 m wide / Not included |
| Boundary | Chain link fence 2.4 m |
| Quality | NABL lab testing of materials |
| Machinery | Batching plant at sitemade to order: Piling rigs and excavators |
| Duration | 3-6 months |
| Payment terms | Measured running billsmade to order: Item rate with retention |