Catalogue / Power system studies (load flow, short circuit, grid code)
Grid code compliance study, Edge 7 seriesSample
by Satpura Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Satpura Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Satpura Edge 7 grid code compliance study, offered in 6 network scale options from 11 kV plant to 400 kV system. Design: relay setting files ready to load, PSS/E and PSCAD model support and models acceptable to STU and CTUIL. Typically used for industrial plants adding generation, renewable developers seeking connectivity and utilities and consultants. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation Kick-off in 1 week; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Satpura
- Model
- SAT-4C2 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Kick-off in 1 week
- Warranty
- Clarifications to utility at no cost
- Standards
- CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Network scale11 kV plantSAT-4C2-01 | Network scale: 11 kV plant | 1 report · Kick-off in 1 week | on quote |
| Network scale33 kV plantSAT-4C2-02 | Network scale: 33 kV plant | 1 report · Kick-off in 1 week | on quote |
| Network scale66 kV systemSAT-4C2-03 | Network scale: 66 kV system | 1 report · Kick-off in 1 week | on quote |
| Network scale132 kV systemSAT-4C2-04 | Network scale: 132 kV system | 1 report · Kick-off in 1 week | on quote |
| Network scale220 kV systemSAT-4C2-05 | Network scale: 220 kV system | 1 report · 2-6 weeks | on quote |
| Network scale400 kV systemSAT-4C2-06 | Network scale: 400 kV system | 1 report · 2-6 weeks | on quote |
Specifications
| Network scale | 11 kV plant to 400 kV system (see variants) |
|---|---|
| Study type | Load flow and short circuit |
| Software | ETAPmade to order: PSS/E / DIgSILENT PowerFactory |
| Model data | Client single line diagram and datamade to order: Utility network model |
| Deliverables | Model files and relay settingsmade to order: Study report with results |
| Grid code checks | Voltage and reactive power capabilitymade to order: LVRT/HVRT and ramp rate |
| Review | Utility submission supportmade to order: Lender review |
| Scenarios | Normal and N-1made to order: Multiple dispatch cases |
| Team | Lead plus modelling specialistmade to order: Power system engineer |
| Turnaround | 4-6 weeksmade to order: 2-3 weeks |
| Validation | Compared with measured data |