Catalogue / Grid connectivity & GNA applications
Stage-II connectivity and bank guarantee support, Flex seriesSample
by Satpura Projects (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Satpura Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Flex service of stage-II connectivity and bank guarantee support by Satpura covers 4 capacity applied options (50 MW to 500 MW). Key features: support for relinquishment and transfer, preparation of mandatory technical details and eligibility check before filing. Typically used for storage developers, industrial captive generators and green hydrogen projects. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Grant 3-9 months; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Satpura
- Model
- SAT-379 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Grant 3-9 months
- Warranty
- Rework of deficient applications
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied50 MWSAT-379-01 | Capacity applied: 50 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied100 MWSAT-379-02 | Capacity applied: 100 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied250 MWSAT-379-03 | Capacity applied: 250 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied500 MWSAT-379-04 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | for verified buyers |
Specifications
| Capacity applied | 50 MW to 500 MW (see variants) |
|---|---|
| Application | Connectivitymade to order: GNA / Both |
| Scope | Document preparation and filingmade to order: End-to-end liaison |
| Bank guarantee | Arranged through partner bankmade to order: Arranged by client |
| Studies | Detailed power system studymade to order: Grid impact summary |
| Portal handling | STU portal |
| Team | Regulatory lead and engineermade to order: Dedicated manager |
| Timeline | Filing in 2 weeksmade to order: Approval 3-6 months |
| Technical documents | Switchyard layout and GA drawings |
| Queries | Until grant |
| Fee basis | Fixed plus successmade to order: Fixed |