Catalogue / Cabling, trenching & HDD works

No photo yet

Underground cable route survey, Prime 9 seriesSample

by Satpura Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Satpura Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Satpura Prime 9 underground cable route survey, offered in 6 cable route length options from 1 km to 50 km. Design: traffic management at crossings, HDD bore log and as-built survey and warning tape and marker installation. Suited to railway and highway crossings, urban distribution upgrades and industrial plant cabling. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Satpura
Model
SAT-3B9 series
Listing type
Service
Unit
km
Minimum order
1 km
Lead time
Mobilisation in 7 days
Warranty
Workmanship 12 months
Standards
IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
Delivers to
South India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Cable route length1 kmSAT-3B9-01Cable route length: 1 km1 km · Mobilisation in 7 dayson quote
Cable route length2 kmSAT-3B9-02Cable route length: 2 km1 km · Mobilisation in 7 dayson quote
Cable route length5 kmSAT-3B9-03Cable route length: 5 km1 km · Mobilisation in 7 dayson quote
Cable route length10 kmSAT-3B9-04Cable route length: 10 km1 km · Mobilisation in 7 dayson quote
Cable route length20 kmSAT-3B9-05Cable route length: 20 km1 km · Permits may extend timelineon quote
Cable route length50 kmSAT-3B9-06Cable route length: 50 km1 km · Permits may extend timelineon quote

Specifications

Cable route length1 km to 50 km (see variants)
MethodOpen trenchmade to order: Trenchless HDD / Trench plus HDD for crossings
HDD capacityUp to 450 mm boremade to order: Up to 250 mm bore
Trench depth1.2 mmade to order: 0.9 m / 1.5 m
Cable type11/33 kV XLPEmade to order: LT armoured
JointingCold shrink
RestorationBackfill and compaction only
PermissionsClient arranges
TestingInsulation and VLF testmade to order: Hipot and sheath test
Productivity50 m per day HDD
CrewTrenching team of 15

BARREL: Bharat Atom Renewable Resources Energy Limited