Satpura Prime 9 underground cable route survey, offered in 6 cable route length options from 1 km to 50 km. Design: traffic management at crossings, HDD bore log and as-built survey and warning tape and marker installation. Suited to railway and highway crossings, urban distribution upgrades and industrial plant cabling. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Satpura
- Model
- SAT-3B9 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Mobilisation in 7 days
- Warranty
- Workmanship 12 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length1 kmSAT-3B9-01 | Cable route length: 1 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length2 kmSAT-3B9-02 | Cable route length: 2 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length5 kmSAT-3B9-03 | Cable route length: 5 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length10 kmSAT-3B9-04 | Cable route length: 10 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length20 kmSAT-3B9-05 | Cable route length: 20 km | 1 km · Permits may extend timeline | on quote |
| Cable route length50 kmSAT-3B9-06 | Cable route length: 50 km | 1 km · Permits may extend timeline | on quote |
Specifications
| Cable route length | 1 km to 50 km (see variants) |
|---|---|
| Method | Open trenchmade to order: Trenchless HDD / Trench plus HDD for crossings |
| HDD capacity | Up to 450 mm boremade to order: Up to 250 mm bore |
| Trench depth | 1.2 mmade to order: 0.9 m / 1.5 m |
| Cable type | 11/33 kV XLPEmade to order: LT armoured |
| Jointing | Cold shrink |
| Restoration | Backfill and compaction only |
| Permissions | Client arranges |
| Testing | Insulation and VLF testmade to order: Hipot and sheath test |
| Productivity | 50 m per day HDD |
| Crew | Trenching team of 15 |