Catalogue / Substation construction

No photo yet

Switchyard erection and bus bar works, Edge seriesSample

by Satpura Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Satpura Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Satpura Edge switchyard erection and bus bar works, offered in 3 voltage class options from 33 kV to 132 kV. Highlights: full documentation pack and as-built, earth grid designed for fault level and soil resistivity and pre-commissioning tests before CEIG visit. Suited to renewable pooling stations, industrial captive substations and state utility augmentation. Delivered in line with CEA (Technical Standards for Construction of Electrical Plants) Regulations, IEC 61936-1 and IS 3043 (Earthing). Mobilisation Engineering in 4-6 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Satpura
Model
SAT-095 series
Listing type
Service
Unit
bay
Minimum order
1 bay
Lead time
Engineering in 4-6 weeks
Warranty
Equipment as per OEM
Standards
CEA (Technical Standards for Construction of Electrical Plants) Regulations, IEC 61936-1, IS 3043 (Earthing)
Delivers to
South India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Voltage class33 kVSAT-095-01Voltage class: 33 kV1 bay · Engineering in 4-6 weekson quote
Voltage class66 kVSAT-095-02Voltage class: 66 kV1 bay · Engineering in 4-6 weekson quote
Voltage class132 kVSAT-095-03Voltage class: 132 kV1 bay · Engineering in 4-6 weekson quote

Specifications

Voltage class33 kV to 132 kV (see variants)
TypeOutdoor AISmade to order: Indoor GIS / Hybrid GIS
ScopeFull turnkeymade to order: Civil and structural / Erection and testing
TransformersUp to 50 MVA
EarthingGI flat grid with ground rods
Bay count6-10 bays
Protection schemeMain-1 and Main-2 relays
SCADA and communicationIEC 61850 compliantmade to order: IEC 60870-5-104
StatutoryCEIG inspection supportmade to order: STU charging approval
Duration6-9 monthsmade to order: 12-15 months
Payment termsPercentage on supply, erection

BARREL: Bharat Atom Renewable Resources Energy Limited