Catalogue / Civil & foundation works

No photo yet

Pre-cast and cast-in-situ foundations for transformers, Neo 9 seriesSample

by Satpura Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Satpura Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Satpura Neo 9 pre-cast and cast-in-situ foundations for transformers, offered in 5 works volume options from 1 MW equivalent to 50 MW equivalent. Key features: pile layout tolerance maintained to design, local labour employed where possible and daily quantity and progress log. Suited to substations and control rooms, solar parks and industrial plants. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Satpura
Model
SAT-471 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
Mobilisation in 10 days
Warranty
Pile load test certified
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
South India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume1 MW equivalentSAT-471-01Works volume: 1 MW equivalent1 job · Mobilisation in 10 dayson quote
Works volume5 MW equivalentSAT-471-02Works volume: 5 MW equivalent1 job · Mobilisation in 10 dayson quote
Works volume10 MW equivalentSAT-471-03Works volume: 10 MW equivalent1 job · Mobilisation in 10 dayson quote
Works volume25 MW equivalentSAT-471-04Works volume: 25 MW equivalent1 job · 4-12 weeks executionon quote
Works volume50 MW equivalentSAT-471-05Works volume: 50 MW equivalent1 job · 4-12 weeks executionon quote

Specifications

Works volume1 MW equivalent to 50 MW equivalent (see variants)
Foundation typeRaft or isolated footingmade to order: Driven steel pile / Ramming or screw pile / RCC bored pile
Concrete gradeM40 for turbine foundation
Pull-out testingRandom test plus lateral load
ReinforcementFe 500D TMTmade to order: Fe 550D
Roads and drainageWBM road with culverts
BoundaryCompound wall with barbed wiremade to order: Chain link fence 2.4 m
QualityCube test reports per pour
MachineryBatching plant at site
Duration3-6 months
Payment termsItem rate with retention

BARREL: Bharat Atom Renewable Resources Energy Limited