Catalogue / Power system studies (load flow, short circuit, grid code)
Harmonic and power quality study, Titan seriesSample
by Satpurapushpak Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Satpurapushpak Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Titan service of harmonic and power quality study by Satpurapushpak covers 6 network scale options (11 kV plant to 400 kV system). Design: reports for GNA/connectivity application, PSS/E and PSCAD model support and relay setting files ready to load. Suited to utilities and consultants, BESS integrators and renewable developers seeking connectivity. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation 2-6 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Satpurapushpak
- Model
- SAT-4B2 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- 2-6 weeks
- Warranty
- Clarifications to utility at no cost
- Standards
- CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Network scale11 kV plantSAT-4B2-01 | Network scale: 11 kV plant | 1 report · 2-6 weeks | on quote |
| Network scale33 kV plantSAT-4B2-02 | Network scale: 33 kV plant | 1 report · 2-6 weeks | on quote |
| Network scale66 kV systemSAT-4B2-03 | Network scale: 66 kV system | 1 report · 2-6 weeks | on quote |
| Network scale132 kV systemSAT-4B2-04 | Network scale: 132 kV system | 1 report · 2-6 weeks | on quote |
| Network scale220 kV systemSAT-4B2-05 | Network scale: 220 kV system | 1 report · 2-6 weeks | on quote |
| Network scale400 kV systemSAT-4B2-06 | Network scale: 400 kV system | 1 report · 2-6 weeks | on quote |
Specifications
| Network scale | 11 kV plant to 400 kV system (see variants) |
|---|---|
| Study type | Protection coordination |
| Software | PSS/E |
| Model data | Utility network modelmade to order: Client single line diagram and data |
| Deliverables | Model files and relay settings |
| Grid code checks | LVRT/HVRT and ramp ratemade to order: Voltage and reactive power capability |
| Review | Lender review |
| Scenarios | Normal and N-1made to order: Multiple dispatch cases |
| Team | Lead plus modelling specialistmade to order: Power system engineer |
| Turnaround | 2-3 weeks |
| Validation | Peer reviewmade to order: Compared with measured data |