Catalogue / Cabling, trenching & HDD works
Duct bank and conduit installation, Ultra 7 seriesSample
by Satpurapushpak Projects (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Satpurapushpak Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Duct bank and conduit installation from Satpurapushpak, Ultra 7 series: 6 cable route length options between 1 km and 50 km. Highlights: dewatering in high water table, utility locating before excavation and drum handling and pulling tension control. Suited to renewable plant internal networks, industrial plant cabling and urban distribution upgrades. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Satpurapushpak
- Model
- SAT-C11 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Mobilisation in 7 days
- Warranty
- Workmanship 12 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length1 kmSAT-C11-01 | Cable route length: 1 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length2 kmSAT-C11-02 | Cable route length: 2 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length5 kmSAT-C11-03 | Cable route length: 5 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length10 kmSAT-C11-04 | Cable route length: 10 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length20 kmSAT-C11-05 | Cable route length: 20 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length50 kmSAT-C11-06 | Cable route length: 50 km | 1 km · Permits may extend timeline | for verified buyers |
Specifications
| Cable route length | 1 km to 50 km (see variants) |
|---|---|
| Method | Trenchless HDDmade to order: Open trench / Trench plus HDD for crossings |
| HDD capacity | Up to 450 mm bore |
| Trench depth | 1.2 mmade to order: 0.9 m / 1.5 m |
| Cable type | LT armouredmade to order: 11/33 kV XLPE |
| Jointing | Heat shrinkmade to order: Cold shrink / Premoulded |
| Restoration | Road and footpath restoration |
| Permissions | Client arranges |
| Testing | Hipot and sheath test |
| Productivity | 50 m per day HDDmade to order: 300 m per day open trench |
| Crew | Trenching team of 15made to order: HDD crew of 8 with rig |