Catalogue / Cabling, trenching & HDD works

No photo yet

Duct bank and conduit installation, Ultra 7 seriesSample

by Satpurapushpak Projects (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Satpurapushpak Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Duct bank and conduit installation from Satpurapushpak, Ultra 7 series: 6 cable route length options between 1 km and 50 km. Highlights: dewatering in high water table, utility locating before excavation and drum handling and pulling tension control. Suited to renewable plant internal networks, industrial plant cabling and urban distribution upgrades. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Satpurapushpak
Model
SAT-C11 series
Listing type
Service
Unit
km
Minimum order
1 km
Lead time
Mobilisation in 7 days
Warranty
Workmanship 12 months
Standards
IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Cable route length1 kmSAT-C11-01Cable route length: 1 km1 km · Mobilisation in 7 daysfor verified buyers
Cable route length2 kmSAT-C11-02Cable route length: 2 km1 km · Mobilisation in 7 daysfor verified buyers
Cable route length5 kmSAT-C11-03Cable route length: 5 km1 km · Mobilisation in 7 daysfor verified buyers
Cable route length10 kmSAT-C11-04Cable route length: 10 km1 km · Mobilisation in 7 daysfor verified buyers
Cable route length20 kmSAT-C11-05Cable route length: 20 km1 km · Permits may extend timelinefor verified buyers
Cable route length50 kmSAT-C11-06Cable route length: 50 km1 km · Permits may extend timelinefor verified buyers

Specifications

Cable route length1 km to 50 km (see variants)
MethodTrenchless HDDmade to order: Open trench / Trench plus HDD for crossings
HDD capacityUp to 450 mm bore
Trench depth1.2 mmade to order: 0.9 m / 1.5 m
Cable typeLT armouredmade to order: 11/33 kV XLPE
JointingHeat shrinkmade to order: Cold shrink / Premoulded
RestorationRoad and footpath restoration
PermissionsClient arranges
TestingHipot and sheath test
Productivity50 m per day HDDmade to order: 300 m per day open trench
CrewTrenching team of 15made to order: HDD crew of 8 with rig

BARREL: Bharat Atom Renewable Resources Energy Limited