Catalogue / Civil & foundation works

No photo yet

Control room and substation building construction, Pro 7 seriesSample

by Satpurapushpak Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Satpurapushpak Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Satpurapushpak Pro 7 control room and substation building construction, offered in 3 works volume options from 10 MW equivalent to 50 MW equivalent. Highlights: cube and pile test records, monsoon-ready drainage planning and pile layout tolerance maintained to design. Used by industrial plants, substations and control rooms and wind farms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation 4-12 weeks execution; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Satpurapushpak
Model
SAT-3B1 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
4-12 weeks execution
Warranty
Structural defect liability 24 months
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume10 MW equivalentSAT-3B1-01Works volume: 10 MW equivalent1 job · 4-12 weeks executionon quote
Works volume25 MW equivalentSAT-3B1-02Works volume: 25 MW equivalent1 job · 4-12 weeks executionon quote
Works volume50 MW equivalentSAT-3B1-03Works volume: 50 MW equivalent1 job · 4-12 weeks executionon quote

Specifications

Works volume10 MW equivalent to 50 MW equivalent (see variants)
Foundation typeRamming or screw pile
Concrete gradeM25
Pull-out testingRandom test plus lateral load
ReinforcementFe 500D TMT
Roads and drainageNot includedmade to order: Murram road, 4 m wide / WBM road with culverts
BoundaryCompound wall with barbed wiremade to order: Chain link fence 2.4 m
QualityNABL lab testing of materialsmade to order: Cube test reports per pour
MachineryPiling rigs and excavators
Duration4-8 weeksmade to order: 3-6 months
Payment termsItem rate with retention

BARREL: Bharat Atom Renewable Resources Energy Limited