Catalogue / Engineering & design
Balance-of-plant electrical design, Volt seriesSample
by Satpurapushpak Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Satpurapushpak Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Volt service of balance-of-plant electrical design by Satpurapushpak covers 5 plant capacity options (5 MW to 100 MW). Design: compliant with state grid code requirements, yield and loss modelling aligned to bankable reports and cable sizing and voltage drop calculations. Suited to captive and C&I solar owners, EPC contractors bidding for projects and lender technical reviews. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, IEC 62548 and IS 3043 (Earthing). Mobilisation Mobilisation in 7 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Satpurapushpak
- Model
- SAT-CE2 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Mobilisation in 7 days
- Warranty
- Design correction at no cost for 12 months
- Standards
- CEA (Technical Standards for Connectivity) Regulations, IEC 62548, IS 3043 (Earthing)
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity5 MWSAT-CE2-01 | Plant capacity: 5 MW | 1 job · Mobilisation in 7 days | on quote |
| Plant capacity10 MWSAT-CE2-02 | Plant capacity: 10 MW | 1 job · Mobilisation in 7 days | on quote |
| Plant capacity25 MWSAT-CE2-03 | Plant capacity: 25 MW | 1 job · Mobilisation in 7 days | on quote |
| Plant capacity50 MWSAT-CE2-04 | Plant capacity: 50 MW | 1 job · 6-10 weeks | on quote |
| Plant capacity100 MWSAT-CE2-05 | Plant capacity: 100 MW | 1 job · 6-10 weeks | on quote |
Specifications
| Plant capacity | 5 MW to 100 MW (see variants) |
|---|---|
| Deliverables | Design basis report plus drawingsmade to order: GA drawings, SLD, BoQ / Full IFC drawing set with calculations |
| Design software | PVsyst, STAAD, ETAP, Civil 3D |
| Team | Electrical, civil and SCADA discipline leads |
| Turnaround | 3-4 weeksmade to order: 6-8 weeks / 10-12 weeks |
| Revisions included | 2 roundsmade to order: 3 rounds / Unlimited until approval |
| Authority submission support | None |
| Earthing and LA study | Optional add-onmade to order: Included |
| Format | PDF and native CADmade to order: PDF, CAD and BIM model |
| Site visit | Two visits included |
| Payment milestones | 50% advance, 50% on delivery |