Catalogue / Installation & erection
Inverter, transformer and switchgear erection, Volt seriesSample
by Satpurapushpak Projects (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Satpurapushpak Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Satpurapushpak Volt inverter, transformer and switchgear erection, offered in 4 installation scope options from 25 MW to 200 MW. Key features: punch list closure before testing, torque-verified structure and module fixing and mobile team available for remote sites. Typically used for utility solar parks, wind farm substations and c&I rooftop and ground mount. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Phased by block; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Satpurapushpak
- Model
- SAT-DB4 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Phased by block
- Warranty
- Workmanship 12 months
- Standards
- IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installation scope25 MWSAT-DB4-01 | Installation scope: 25 MW | 1 MW · Phased by block | for verified buyers |
| Installation scope50 MWSAT-DB4-02 | Installation scope: 50 MW | 1 MW · Phased by block | for verified buyers |
| Installation scope100 MWSAT-DB4-03 | Installation scope: 100 MW | 1 MW · Phased by block | for verified buyers |
| Installation scope200 MWSAT-DB4-04 | Installation scope: 200 MW | 1 MW · Phased by block | for verified buyers |
Specifications
| Installation scope | 25 MW to 200 MW (see variants) |
|---|---|
| Scope | Complete mechanical and electrical erection |
| Manpower deployed | 25 technicians per MW-blockmade to order: 60 technicians plus supervisors / Peak crew of 200 |
| Supervision | Site engineer and safety officermade to order: Project manager, engineers, QA/QC |
| Equipment | Pile driver, crane, telehandler |
| Quality plan | Client-approved ITP |
| Safety | Lost-time-injury-free target, HIRAmade to order: Daily toolbox talks, PPE, permits |
| Licence | Class A contractor registrationmade to order: Electrical contractor licence |
| Insurance | CAR and workmen compensationmade to order: CAR, WC and third-party liability |
| Reporting | Weekly report with look-ahead plan |
| Payment terms | Monthly running bills |