Catalogue / Resource assessment (solar, wind, hydro)

No photo yet

Wind resource assessment with met mast, Xtra seriesSample

by Satpurapushpak Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Satpurapushpak Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Satpurapushpak Xtra wind resource assessment with met mast, offered in 5 measurement duration options from Desktop study to 18 months. Highlights: data quality control and filling, loss factors for local conditions and extreme wind and wake studies. Used by state agencies mapping resource, wind and solar developers and hybrid project planners. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Campaign 3-24 months; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Satpurapushpak
Model
SAT-CB6 series
Listing type
Service
Unit
report
Minimum order
1 report
Lead time
Campaign 3-24 months
Warranty
Data availability guarantee above 95%
Standards
IEC 61400-12-1, IEC 61724-1, IEC 61400-15
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Measurement durationDesktop studySAT-CB6-01Measurement duration: Desktop study1 report · Campaign 3-24 monthson quote
Measurement duration3 monthsSAT-CB6-02Measurement duration: 3 months1 report · Campaign 3-24 monthson quote
Measurement duration6 monthsSAT-CB6-03Measurement duration: 6 months1 report · Campaign 3-24 monthson quote
Measurement duration12 monthsSAT-CB6-04Measurement duration: 12 months1 report · Campaign 3-24 monthson quote
Measurement duration18 monthsSAT-CB6-05Measurement duration: 18 months1 report · Campaign 3-24 monthson quote

Specifications

Measurement durationDesktop study to 18 months (see variants)
TechnologySolar GHI/DNI
Data sourceOn-site measurement
Equipment80-120 m met mast with LiDARmade to order: Class A pyranometer station
UncertaintyP50/P90 with uncertainty budget
ModellingPVsyst, SAMmade to order: WAsP, WindPRO
DeliverableResource report
CalibrationTraceable calibrationmade to order: Calibration pre and post campaign
Site countMulti-site comparison
MaintenanceRemote health checks
TurnaroundReport in 3 weeks

BARREL: Bharat Atom Renewable Resources Energy Limited