Demand response programme enrolment, Prime 3 seriesSample
by Saurashtra Capital Advisors (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Saurashtra Capital Advisors (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Prime 3 service of demand response programme enrolment by Saurashtra covers 5 curtailable load options (0.5 MW to 25 MW). Key features: revenue for flexible loads, reduced peak demand charges and settlement transparency. Used by commercial buildings, cold storage and water pumping and DISCOMs needing peak relief. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Enrolment 4-8 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Saurashtra
- Model
- SAU-B83 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Enrolment 4-8 weeks
- Warranty
- As per programme terms
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load0.5 MWSAU-B83-01 | Curtailable load: 0.5 MW | 1 MW · Enrolment 4-8 weeks | on quote |
| Curtailable load1 MWSAU-B83-02 | Curtailable load: 1 MW | 1 MW · Enrolment 4-8 weeks | on quote |
| Curtailable load5 MWSAU-B83-03 | Curtailable load: 5 MW | 1 MW · Enrolment 4-8 weeks | on quote |
| Curtailable load10 MWSAU-B83-04 | Curtailable load: 10 MW | 1 MW · Enrolment 4-8 weeks | on quote |
| Curtailable load25 MWSAU-B83-05 | Curtailable load: 25 MW | 1 MW · Enrolment 4-8 weeks | on quote |
Specifications
| Curtailable load | 0.5 MW to 25 MW (see variants) |
|---|---|
| Programme | TOD optimisation |
| Control | Manual |
| Notice | 15 minutes |
| Duration per event | 1 hourmade to order: 4 hours |
| Events per year | Unlimitedmade to order: 20 / 50 |
| Metering | Existing meter |
| Incentive sharing | 70:30 customer:aggregator |
| Baseline method | 10-day average |
| Reporting | Monthly savingsmade to order: Event report |
| Contract term | 3 yearsmade to order: 1 year |