Catalogue / Energy audits

No photo yet

Thermal and utility energy audit, Volt 3 seriesSample

by Saurashtra Capital Advisors (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Saurashtra Capital Advisors (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Thermal and utility energy audit from Saurashtra, Volt 3 series: 3 connected load options between 5 MW and 25 MW. Key features: statutory forms and BEE reporting, power factor and harmonics assessment and verification after implementation. Used by industrial plants, PAT designated consumers and hospitals and hotels. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Audit in 1-2 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Saurashtra
Model
SAU-395 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Audit in 1-2 weeks
Warranty
Savings estimate accuracy within agreed band
Standards
Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
Delivers to
North India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Connected load5 MWSAU-395-01Connected load: 5 MW1 site · Audit in 1-2 weeksfor verified buyers
Connected load10 MWSAU-395-02Connected load: 10 MW1 site · Audit in 1-2 weeksfor verified buyers
Connected load25 MWSAU-395-03Connected load: 25 MW1 site · Audit in 1-2 weeksfor verified buyers

Specifications

Connected load5 MW to 25 MW (see variants)
Audit levelInvestment-grade audit
InstrumentsUltrasonic flow meter, lux meter
AuditorBEE accredited energy auditormade to order: Certified Energy Manager
ReportImplementation roadmapmade to order: Savings opportunities with payback
BaselineMeasured baseline
Measurement duration7 daysmade to order: 3 days / 14 days
CoverageElectricalmade to order: Electrical and thermal / Utilities
StatutoryForm-1 and Form-2 filing
DeliverableReport and presentationmade to order: Report and monitoring plan
Follow-upNot included

BARREL: Bharat Atom Renewable Resources Energy Limited