Catalogue / Hydro turbines (Francis, Kaplan, Pelton)
Turgo turbine, Edge seriesSample
by Saurashtra Hydro Engineering (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Saurashtra Hydro Engineering (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Saurashtra Edge turgo turbine, offered in 6 turbine output options from 3 MW to 100 MW. Key features: model-tested hydraulic design, efficiency guarantee supported by tests and stainless steel runner for sediment-laden rivers. Suited to small hydro projects, renovation and modernisation and run-of-river schemes. Designed and tested to IEC 60193, IEC 60041 and IS 12800. Lead time 10-14 months; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Saurashtra
- Model
- SAU-C24 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 2 nos
- Lead time
- 10-14 months
- Warranty
- 24 months from commissioning
- Standards
- IEC 60193, IEC 60041, IS 12800
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Drum / reel with end caps
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Turbine output3 MWSAU-C24-01 | Turbine output: 3 MW | 2 nos · 10-14 months | for verified buyers |
| Turbine output5 MWSAU-C24-02 | Turbine output: 5 MW | 2 nos · 10-14 months | for verified buyers |
| Turbine output10 MWSAU-C24-03 | Turbine output: 10 MW | 2 nos · 10-14 months | for verified buyers |
| Turbine output25 MWSAU-C24-04 | Turbine output: 25 MW | 2 nos · 10-14 months | for verified buyers |
| Turbine output50 MWSAU-C24-05 | Turbine output: 50 MW | 2 nos · 14-20 months | for verified buyers |
| Turbine output100 MWSAU-C24-06 | Turbine output: 100 MW | 2 nos · 14-20 months | for verified buyers |
Specifications
| Turbine output | 3 MW to 100 MW (see variants) |
|---|---|
| Turbine type | Kaplan |
| Net head | 5-30 m |
| Rated speed | 750 rpmmade to order: 375 rpm / 428 rpm / 500 rpm |
| Shaft orientation | Horizontalmade to order: Vertical |
| Runner material | Cast carbon steelmade to order: 13Cr-4Ni stainless steel |
| Efficiency at best point | 91% |
| Flow range | 3-100 m3/s |
| Wicket gates | Cast steel with oil-free bushes |
| Runaway speed | 2.2 x rated |
| Design life | 40 years |