Catalogue / Changeover switches & ATS panels

No photo yet

Manual changeover switch, Ultra 7 seriesSample

by Saurashtra Switchboards (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Saurashtra Switchboards (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Saurashtra Ultra 7 manual changeover switch, offered in 5 rating options from 63 A to 630 A. Design: mechanical and electrical interlock prevents paralleling sources, programmable voltage and frequency sensing and manual override for maintenance. Typically used for commercial buildings with DG sets, hospitals and data centres and solar-genset hybrid sites. Designed and tested to IEC 60947-6-1, IS/IEC 60947-3 and IS 8623 (Part 1). Lead time 4-6 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Saurashtra
Model
SAU-2B1 series
Listing type
Product
Unit
nos
Minimum order
1 nos
Lead time
4-6 weeks
Warranty
12 months from commissioning
Standards
IEC 60947-6-1, IS/IEC 60947-3, IS 8623 (Part 1)
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
Corrugated box on pallet
Delivery terms
FOR nearest railhead
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Rating63 ASAU-2B1-01Rating: 63 A1 nos · 4-6 weeksfor verified buyers
Rating125 ASAU-2B1-02Rating: 125 A1 nos · 4-6 weeksfor verified buyers
Rating250 ASAU-2B1-03Rating: 250 A1 nos · 4-6 weeksfor verified buyers
Rating400 ASAU-2B1-04Rating: 400 A1 nos · 4-6 weeksfor verified buyers
Rating630 ASAU-2B1-05Rating: 630 A1 nos · 4-6 weeksfor verified buyers

Specifications

Rating63 A to 630 A (see variants)
TypeManual changeovermade to order: Motorised changeover / ATS panel
Poles4P
Rated voltage415 V AC
Transfer deviceContactor pair
TransitionOpenmade to order: Closed / Delayed
ControllerMicroprocessor ATS controller
Transfer timeUnder 10 smade to order: Under 3 s
Mains failure delayAdjustable 0-60 s
Short-circuit withstand25 kAmade to order: 10 kA / 36 kA / 50 kA
EnclosureIP54 sheet steel
Auxiliary supply24 V DCmade to order: 230 V AC
Genset start signalPotential-free contact

BARREL: Bharat Atom Renewable Resources Energy Limited