Catalogue / Changeover switches & ATS panels

No photo yet

Automatic transfer switch (ATS) panel, Ultra 5 seriesSample

by Saurashtra Switchboards (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Saurashtra Switchboards (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Automatic transfer switch (ATS) panel from Saurashtra, Ultra 5 series: 5 rating options between 125 A and 1000 A. Highlights: event log and status LEDs on door, programmable voltage and frequency sensing and mechanical and electrical interlock prevents paralleling sources. Typically used for solar-genset hybrid sites, commercial buildings with DG sets and telecom and industrial facilities. Designed and tested to IEC 60947-6-1, IS/IEC 60947-3 and IS 8623 (Part 1). Lead time 1-2 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Saurashtra
Model
SAU-BE6 series
Listing type
Product
Unit
nos
Minimum order
1 nos
Lead time
1-2 weeks
Warranty
12 months from commissioning
Standards
IEC 60947-6-1, IS/IEC 60947-3, IS 8623 (Part 1)
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
As per item, transit-safe
Delivery terms
Door delivery in metro cities
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Rating125 ASAU-BE6-01Rating: 125 A1 nos · 1-2 weekson quote
Rating250 ASAU-BE6-02Rating: 250 A1 nos · 1-2 weekson quote
Rating400 ASAU-BE6-03Rating: 400 A1 nos · 1-2 weekson quote
Rating630 ASAU-BE6-04Rating: 630 A1 nos · 4-6 weekson quote
Rating1000 ASAU-BE6-05Rating: 1000 A1 nos · 4-6 weekson quote

Specifications

Rating125 A to 1000 A (see variants)
TypeManual changeover
Poles3Pmade to order: 4P
Rated voltage415 V AC
Transfer deviceInterlocked ACBmade to order: Switch-disconnector / Contactor pair / Interlocked MCCB
TransitionClosedmade to order: Open / Delayed
ControllerRelay logicmade to order: Microprocessor ATS controller
Transfer timeUnder 3 s
Mains failure delayAdjustable 0-60 s
Short-circuit withstand10 kA
EnclosureIP42 sheet steel
Auxiliary supply230 V ACmade to order: 24 V DC
Genset start signalPotential-free contactmade to order: CAN / Modbus

BARREL: Bharat Atom Renewable Resources Energy Limited