Catalogue / Waste-to-energy (incineration, RDF)

No photo yet

Municipal solid waste incinerator, Neo seriesSample

by Saurashtravajra Waste to Energy (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Saurashtravajra Waste to Energy (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Neo range of municipal solid waste incinerator by Saurashtravajra covers 6 plant capacity options (100 TPD to 1500 TPD). Highlights: continuous emission monitoring linked to CPCB, automated crane and grate control and odour control through negative pressure bunker. Used by industrial waste processors, PPP waste-to-energy developers and municipal corporations. Designed and tested to SWM Rules 2016, CPCB emission norms and IBR 1950. Lead time 18-24 months; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Saurashtravajra
Model
SAU-1E8 series
Listing type
Product
Unit
lot
Minimum order
1 lot
Lead time
18-24 months
Warranty
24 months
Standards
SWM Rules 2016, CPCB emission norms, IBR 1950
Delivers to
West India
GST rate
18 %
Country of origin
India
Packaging
Drum / reel with end caps
Delivery terms
FOR nearest railhead
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity100 TPDSAU-1E8-01Plant capacity: 100 TPD1 lot · 18-24 monthsfor verified buyers
Plant capacity300 TPDSAU-1E8-02Plant capacity: 300 TPD1 lot · 18-24 monthsfor verified buyers
Plant capacity500 TPDSAU-1E8-03Plant capacity: 500 TPD1 lot · 18-24 monthsfor verified buyers
Plant capacity750 TPDSAU-1E8-04Plant capacity: 750 TPD1 lot · 18-24 monthsfor verified buyers
Plant capacity1000 TPDSAU-1E8-05Plant capacity: 1000 TPD1 lot · 24-30 monthsfor verified buyers
Plant capacity1500 TPDSAU-1E8-06Plant capacity: 1500 TPD1 lot · 24-30 monthsfor verified buyers

Specifications

Plant capacity100 TPD to 1500 TPD (see variants)
TechnologyGasificationmade to order: Moving grate / Fluidised bed
FuelIndustrial waste
Calorific value1500 kcal/kgmade to order: 2500 kcal/kg / 3200 kcal/kg
Steam parameters67 bar / 485 C
Power output20 MW
Flue gas cleaningSNCR, lime, bag filter, activated carbon
Residence time> 2 s at 850 C
Ash handlingWet bottom ash extractor
Dioxin controlActivated carbon injection
MonitoringCEMS online to CPCB
Design life25 years

BARREL: Bharat Atom Renewable Resources Energy Limited