Catalogue / Induction & arc furnaces

No photo yet

Electric arc furnace with ladle refining, Pro 5 seriesSample

by Setucore Thermal Electrification (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Setucore Thermal Electrification (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Pro 5 range of electric arc furnace with ladle refining by Setucore covers 5 furnace capacity options (500 kg to 12 MT). Design: fume extraction integrated, waste heat recovery option and thyristor or IGBT power supply with soft start. Typically used for copper and brass, rolling mill billet makers and ferro-alloys. Designed and tested to IS 3043, IEC 60519-3 and IEC 60519-6. Lead time 10-14 weeks; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Setucore
Model
SET-435 series
Listing type
Product
Unit
nos
Minimum order
2 nos
Lead time
10-14 weeks
Warranty
12 months
Standards
IS 3043, IEC 60519-3, IEC 60519-6
Delivers to
North India
GST rate
18 %
Country of origin
India
Packaging
Drum / reel with end caps
Delivery terms
Ex-works, freight extra at actuals
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Furnace capacity500 kgSET-435-01Furnace capacity: 500 kg2 nos · 10-14 weekson quote
Furnace capacity1 MTSET-435-02Furnace capacity: 1 MT2 nos · 10-14 weekson quote
Furnace capacity3 MTSET-435-03Furnace capacity: 3 MT2 nos · 10-14 weekson quote
Furnace capacity6 MTSET-435-04Furnace capacity: 6 MT2 nos · 20-30 weekson quote
Furnace capacity12 MTSET-435-05Furnace capacity: 12 MT2 nos · 20-30 weekson quote

Specifications

Furnace capacity500 kg to 12 MT (see variants)
TypeCoreless induction
Power supply1.5 MW
Frequency500 Hz
Charge materialSteel scrapmade to order: Cast iron / DRI/HBI / Copper
Melt time per heat45 minmade to order: 60-75 min
Specific energy380-420 kWh/MT
CoolingClosed-loop water circuit
TiltingHydraulic
LiningAcid ramming massmade to order: Neutral lining
Power factor0.95 with capacitor bank
Dust extractionFume hood and bag filter

BARREL: Bharat Atom Renewable Resources Energy Limited