Catalogue / Site acceptance & pre-commissioning tests

No photo yet

Pre-commissioning tests for substations, Volt seriesSample

by Shaktimark Projects (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Shaktimark Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Pre-commissioning tests for substations from Shaktimark, Volt series: 5 plant size options between 10 MW and 250 MW. Highlights: checklist driven testing, thermography prior to energisation and instrument calibration certificates. Used by renewable parks, lender completion and industrial substations. Delivered in line with IEC 62446-1, IS 3043 and IEC 61557. Mobilisation On-site 3-21 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Shaktimark
Model
SHA-1A5 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
On-site 3-21 days
Warranty
Retest at no cost on instrument error
Standards
IEC 62446-1, IS 3043, IEC 61557
Delivers to
South India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant size10 MWSHA-1A5-01Plant size: 10 MW1 site · On-site 3-21 daysfor verified buyers
Plant size25 MWSHA-1A5-02Plant size: 25 MW1 site · On-site 3-21 daysfor verified buyers
Plant size50 MWSHA-1A5-03Plant size: 50 MW1 site · On-site 3-21 daysfor verified buyers
Plant size100 MWSHA-1A5-04Plant size: 100 MW1 site · On-site 3-21 daysfor verified buyers
Plant size250 MWSHA-1A5-05Plant size: 250 MW1 site · On-site 3-21 daysfor verified buyers

Specifications

Plant size10 MW to 250 MW (see variants)
ScopeComplete SAT with performance testmade to order: Electrical pre-commissioning / Solar SAT
InstrumentsInsulation tester, earth tester
Test sequenceVisual, mechanical, electricalmade to order: Per client approved format
TeamTeam of 6 with leadmade to order: Test engineer plus 2 technicians
Duration on site3-5 daysmade to order: 10 days / 3 weeks
ReportsDigital dossier with photosmade to order: Test results on approved formats
CalibrationCalibration certificates attached
Witnessed byLender engineer or authority
Retest policyCharged
Payment50% advancemade to order: On completion of report