Catalogue / Electrical safety audits

No photo yet

Fire and arc-flash risk assessment, Xtra seriesSample

by Shaktimark Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Shaktimark Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Shaktimark Xtra fire and arc-flash risk assessment, offered in 5 installed load options from 500 kVA to 25 MVA. Design: risk-ranked findings, compliance matrix against CEA safety rules and earthing health and soil resistivity. Typically used for hospitals and commercial buildings, data centres and manufacturing plants. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Shaktimark
Model
SHA-2D4 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Audit in 1-2 weeks
Warranty
Clarifications on report at no cost for 6 months
Standards
Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
Delivers to
South India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Installed load500 kVASHA-2D4-01Installed load: 500 kVA1 site · Audit in 1-2 weekson quote
Installed load1 MVASHA-2D4-02Installed load: 1 MVA1 site · Audit in 1-2 weekson quote
Installed load5 MVASHA-2D4-03Installed load: 5 MVA1 site · Audit in 1-2 weekson quote
Installed load10 MVASHA-2D4-04Installed load: 10 MVA1 site · Report in 7-14 dayson quote
Installed load25 MVASHA-2D4-05Installed load: 25 MVA1 site · Report in 7-14 dayson quote

Specifications

Installed load500 kVA to 25 MVA (see variants)
ScopeAudit with measurementsmade to order: Visual and documentation audit / Audit with arc-flash study
AuditorChartered engineermade to order: CEA-licensed engineer
MeasurementsThermography and power quality
ReportAction plan with timeline
Statutory recordsRegisters, test certificates, licencemade to order: Permit-to-work audit
SamplingRepresentative LV panelsmade to order: 100% of HV equipment
Follow-upClose-out verificationmade to order: Re-audit after 3 months
Turnaround3-4 weeks
PresentationReport only
AccreditationISO/IEC 17020 body

BARREL: Bharat Atom Renewable Resources Energy Limited