Catalogue / Power system studies (load flow, short circuit, grid code)

No photo yet

Protection coordination and relay setting, Max seriesSample

by Shaktimark Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Shaktimark Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Protection coordination and relay setting from Shaktimark, Max series: 3 network scale options between 11 kV plant and 66 kV system. Key features: models acceptable to STU and CTUIL, PSS/E and PSCAD model support and reactive power capability curves. Suited to utilities and consultants, industrial plants adding generation and renewable developers seeking connectivity. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation Kick-off in 1 week; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Shaktimark
Model
SHA-F19 series
Listing type
Service
Unit
report
Minimum order
1 report
Lead time
Kick-off in 1 week
Warranty
Revision for utility comments
Standards
CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
Delivers to
South India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Network scale11 kV plantSHA-F19-01Network scale: 11 kV plant1 report · Kick-off in 1 weekon quote
Network scale33 kV plantSHA-F19-02Network scale: 33 kV plant1 report · Kick-off in 1 weekon quote
Network scale66 kV systemSHA-F19-03Network scale: 66 kV system1 report · Kick-off in 1 weekon quote

Specifications

Network scale11 kV plant to 66 kV system (see variants)
Study typeDynamic and transientmade to order: Load flow and short circuit / Harmonics / Protection coordination
SoftwareETAPmade to order: PSS/E / DIgSILENT PowerFactory
Model dataUtility network modelmade to order: Client single line diagram and data
DeliverablesStudy report with resultsmade to order: Model files and relay settings
Grid code checksVoltage and reactive power capability
ReviewUtility submission support
ScenariosNormal and N-1made to order: Multiple dispatch cases
TeamLead plus modelling specialistmade to order: Power system engineer
Turnaround4-6 weeksmade to order: 2-3 weeks
ValidationCompared with measured data

BARREL: Bharat Atom Renewable Resources Energy Limited