Catalogue / Third-party inspection (TPI)
Pre-dispatch inspection of transformers and switchgear, Plus seriesSample
by Shaktimark Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Shaktimark Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Pre-dispatch inspection of transformers and switchgear from Shaktimark, Plus series: 3 inspection effort options between 20 man-days and 100 man-days. Highlights: photographic evidence of each inspection, quick mobilisation across India and hold and witness points per QAP. Suited to lender quality assurance, government procurement and utilities and PSUs. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Shaktimark
- Model
- SHA-094 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Inspector assigned in 48 hours
- Warranty
- Re-inspection at no cost for disputed lots
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort20 man-daysSHA-094-01 | Inspection effort: 20 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort50 man-daysSHA-094-02 | Inspection effort: 50 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort100 man-daysSHA-094-03 | Inspection effort: 100 man-days | 1 day · Inspector assigned in 48 hours | on quote |
Specifications
| Inspection effort | 20 man-days to 100 man-days (see variants) |
|---|---|
| Equipment inspected | PV modules and inverters |
| Inspection stage | Raw materialmade to order: In-process / Final pre-dispatch |
| Standards used | Per approved QAPmade to order: Per client specification |
| Inspector qualification | Level II NDT certified |
| Accreditation | Empanelled inspection agencymade to order: ISO/IEC 17020 body |
| Report | Detailed report with photos in 48 hours |
| Coverage | Domestic and export vendorsmade to order: Pan India |
| Sampling | As per IS 2500 |
| Release note | Hard copy plus scan |
| Travel | Included in ratemade to order: At actuals |