Catalogue / Resource assessment (solar, wind, hydro)
Solar resource assessment with ground measurement, Prime 4 seriesSample
by Shaktimark Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Shaktimark Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Prime 4 service of solar resource assessment with ground measurement by Shaktimark covers 3 measurement duration options (Desktop study to 6 months). Key features: long-term correction using reference data, independent bankable estimate and extreme wind and wake studies. Suited to state agencies mapping resource, lenders needing P90 and wind and solar developers. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Shaktimark
- Model
- SHA-0E7 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Desktop in 2-3 weeks
- Warranty
- As per contract
- Standards
- IEC 61400-12-1, IEC 61724-1, IEC 61400-15
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Measurement durationDesktop studySHA-0E7-01 | Measurement duration: Desktop study | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration3 monthsSHA-0E7-02 | Measurement duration: 3 months | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration6 monthsSHA-0E7-03 | Measurement duration: 6 months | 1 report · Desktop in 2-3 weeks | on quote |
Specifications
| Measurement duration | Desktop study to 6 months (see variants) |
|---|---|
| Technology | Small hydro |
| Data source | On-site measurement |
| Equipment | 80-120 m met mast with LiDARmade to order: Class A pyranometer station |
| Uncertainty | Bankable assessment |
| Modelling | WAsP, WindPRO |
| Deliverable | Hourly time series datasetmade to order: Resource report |
| Calibration | Traceable calibration |
| Site count | Multi-site comparisonmade to order: Single site |
| Maintenance | Quarterly site visitmade to order: Remote health checks |
| Turnaround | Report in 3 weeksmade to order: Report within 6 weeks of data |