Catalogue / Electrical safety audits

No photo yet

Fire and arc-flash risk assessment, Ultra seriesSample

by Shaktimark Projects (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Shaktimark Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Shaktimark Ultra fire and arc-flash risk assessment, offered in 4 installed load options from 5 MVA to 50 MVA. Design: risk-ranked findings, fire exit and detection checks and compliance matrix against CEA safety rules. Suited to solar and wind sites, manufacturing plants and data centres. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Report in 7-14 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Shaktimark
Model
SHA-2D5 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Report in 7-14 days
Warranty
Clarifications on report at no cost for 6 months
Standards
Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
Delivers to
South India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Installed load5 MVASHA-2D5-01Installed load: 5 MVA1 site · Report in 7-14 daysfor verified buyers
Installed load10 MVASHA-2D5-02Installed load: 10 MVA1 site · Report in 7-14 daysfor verified buyers
Installed load25 MVASHA-2D5-03Installed load: 25 MVA1 site · Report in 7-14 daysfor verified buyers
Installed load50 MVASHA-2D5-04Installed load: 50 MVA1 site · Report in 7-14 daysfor verified buyers

Specifications

Installed load5 MVA to 50 MVA (see variants)
ScopeAudit with measurements
AuditorChartered engineermade to order: CEA-licensed engineer
MeasurementsEarth resistance, insulation
ReportFindings with risk ratingmade to order: Action plan with timeline
Statutory recordsPermit-to-work audit
Sampling100% of HV equipment
Follow-upClose-out verificationmade to order: Re-audit after 3 months
Turnaround1-2 weeksmade to order: 3-4 weeks
PresentationFindings to managementmade to order: Report only
AccreditationGovernment recognised agency

BARREL: Bharat Atom Renewable Resources Energy Limited